5.1 Are work instruction and corrective action procedures used?
5.2 Are adequate in-process records kept?
5.3 Are WIP and parts positively identified and controlled (e.g. too long exposure before next process)?
5.4 Is reworked material reinspected to a documented procedure?
5.5 Is there a system to control use and re-use of in-process tray or container?
5.6 Are finished parts inspected to a documented procedure?
5.7 Are finished parts tested and the results documented?
5.8 Are adequate inspection records retained?
5.9 Are storage, handling, packaging and labeling of finished products adequate?
5.10 Is there a system to ensure conformance to WD packaging specification 96-004251?
5.11 Is there a documented procedure for usage of reusable finished goods packaging or tray for shipment in terms of cleanliness and quality control?
5.12 Is the traceability system in place to enable the review of all manufacturing, test, and inspection data for any material lot, batch, or date range as applicable.
5.13 Is there a foolproof system in place to prevent mix up, shortage, wrong labelling of parts.