In all crossdocking situations, the timing of delivery and pickup is crucial to effective operations. The performance of crossdocking depends on good planning and scheduling.
Li et al. [15] considered short term scheduling of material handling inside the terminal for a given truck schedule. They model the jobs and resources as a machine scheduling problem and present a metaheuristic for its solution