(iii) the Contractor shall submit detailed electrical equipment list and Drawings for the works detailed in sub-paragraphs (i) and (ii) for the Employer’s approval prior to the commencement of procurement. In the event that the Employer does not object to the proposed detailed equipment list and Drawings submitted by the Contractor for approval within a period of thirty (30) days after the date of submission, then the Employer shall be deemed to have approved the detailed equipment list and Drawings.
(iv) the electricity fee charged for the Contractor’s Facility shall be included in the Services Fee at the rate three (3) Thai Baht per kilowatt-hour.
The Contractor shall ensure, at its sole cost, that all of the equipment to be provided by it under this paragraph (c) is maintained in working condition, and, if required, replaced accordingly. In the event that the Employer is unable to provide electricity to the Contractor due to the Contractor’s failure to maintain such equipment in working condition or replace such equipment as may be required, such inability by the Employer to provide electricity shall not be deemed as a forced outage or the Employer's suspension.