Please request KHT clarify and response my comment as following;
1) Anchor blots, blots and nuts shall be hot dip galvanized. Is there cost impact?
2) External bottom plate shall be painted. Please confirm.
3) GMAW and FCAW welding process are NOT allow. Please confirm.
4) Operation plate form, handrail, ladder, and ladder cage shall be included. Please confirm.
5) Refer to Clarified Water Tank, please add bird screen at vent nozzle. Is there cost impact?
6) Refer to Clarified Water Tank, Please add 12” elbow 90 inside the tank, connect to outlet nozzle. Is there cost impact?
7) Detail drawing shall be complied with project spec. ME-101 Vessel Standard. Please confirm.
8) If there are no deviation, ITE will note KHT complied with all project specification per attached RFQ. Please confirm.
- RFQ, data sheet, and GA drawing.
- ME-002 Storage Tank
- ME-025 General Specification for Shop Inspection and Test
- ME-101 Vessel Standard
- SP-008 General Welding For Petrochemical Plant
- SP-009 Painting.pdf
9) Please offer an optional quotation for unloading at site.