B. In – situ tests to confirm that the required degree of compaction is being achieved during construction Test Frequency of test (not less than one test per…) Dry density 500 m² CBR 4500 m²
B. In – situ tests to confirm that the required degree of compaction is being achieved during constructionTest Frequency of test (not less than one test per…) Dry density 500 m² CBR 4500 m²