As condition payment advance no.25 regarding the Tower curtain wall must be installing until 22nd floor on 25th January 2015 as reference 1. As they inspector have curtain wall doesn’t installation about 149 panels (exclude Hoist area about 74 panels) Therefore, we are pleased request to accelerate to install as soon as possible.