The flat-paced building components minimize transportation volume and promote sustainability through material and structural efficiency. The inherent nature of prefabricated design ensures low embodied energy and minimizes site waste. Low-&Non-v.o.c products were used in all cabinetry and paint applications. The prototype was completed in may 2009, with an 8 week construction time table.