As ITD informed to temporary demolish elevator and remove awning for protection the dust on 15th December 2014 as reference above due lift shaft handover are delay that make the date for elevator installation move from the schedule. The temporary elevator can demolish after the elevator HS1-HS3 install.
Therefore, we would like to accelerate to handover lift shaft and move schedule for demolish temporary elevator until HS1-HS3 finish.