This research aims at identifying the risk factors in the construction of high-rise buildings in Pattaya, which affects significantly construction business. The results were analyzed to determine an approach to control the risk to reduce the risk and enhance the work efficiency. In this study, the experts from for 17 projects were interviewed. Most of the experts are project managers with more than 11 year experience and graduate level. Consequently, the interview results are considered as reliable. The analysis of 160 events shows that there are 57 extremely high risk events, 44 high risk events, 25 medium risk events and 34 low risk events. Following is the high risk factors: architecture, building system, structure, documentary, preparation and contract. Different levels of risk. Solutions for the risk management (risk response) consists of 6 ways based on prevention, trace, treatment and recommendation concept. Following the 6 ways, the risk opportunity could be reduced. The proposed solution approach could reduce the risk opportunity and enhance the work quality and efficiency.
School of
This research aims at identifying the risk factors in the construction of high-rise buildings in Pattaya, which affects significantly construction business. The results were analyzed to determine an approach to control the risk to reduce the risk and enhance the work efficiency. In this study, the experts from for 17 projects were interviewed. Most of the experts are project managers with more than 11 year experience and graduate level. Consequently, the interview results are considered as reliable. The analysis of 160 events shows that there are 57 extremely high risk events, 44 high risk events, 25 medium risk events and 34 low risk events. Following is the high risk factors: architecture, building system, structure, documentary, preparation and contract. Different levels of risk. Solutions for the risk management (risk response) consists of 6 ways based on prevention, trace, treatment and recommendation concept. Following the 6 ways, the risk opportunity could be reduced. The proposed solution approach could reduce the risk opportunity and enhance the work quality and efficiency.
School of
การแปล กรุณารอสักครู่..
