2) Demolition/Relocation of existing Facility Store and all utilities supplied to the building.
3) Demolition/Relocation of existing Model Shop and all utilities supplied to the building.
4) Demolition of existing structures at building no.4 to prepare for connection to new Building no.6. It shall include all existing structures that will be obstructed during the construction of Building no.6 such as: