The logical grouping of work can be accomplished by leveraging the cMRO Work Breakdown Structure (WBS), which is passed into Production Scheduling. The Display Parameters tab in the Plan options screen can be used to create logical groupings of work orders. The Selected attributes are used to group work orders into folders within the Work Order Editor in Production Scheduling and allows the planner to group the work orders based on the Work Breakdown Structure.
The Work Breakdown Structure is populated as work order attributes and can be viewed in the Work Order Editor. This allows for enhanced filtering from Work Order Advanced Filters where they can be used to group work orders in the various views when analyzing the schedule.