1. Re-fix, re-calibrate and re-adjust any abnormal conditions found.
2. Repair, replace, clean and make good those minor wear and tear conditions found.
3. Secure all fixing points.
4. Generally, all associated installations and devices related to the equipment shall be checked and serviced.
5. All settings and status of control valves should be resumed to their positions after the testing.
6. All sundry material shall be provided by the Contractor. Spare parts for replacement to be supplied by Employer.
7. Clean and tidy up the working site immediately after completion of the works.
8. All readings and outstanding items shall be recorded in the corresponding work orders, which shall be signed by the Building Engineer for endorsement.
9. Report with recommendation and cost proposals any major repair / replacement works required.