Methodological approach of the present research
3.1. Model
The aim is to develop a model to assess the possibility of how far the "core components for project governance"
(based on the interpretation of Rocha) can be applied in outsourcing projects to minimize the risks.
Model development:
In the first step, the previously named criteria of the different studies are summarized (in the form of the notified
complexity drivers). Double entries will be eliminated. This results in the first dimension of the model. In the second
step, the components of the project governance model will be placed in the second dimension. This matrix is the
basis for the present study.