544 Chapter 9 BIM case Studies
To the lead developer (Senate Properties), along with ISS, the project management consultant the various other design consultants reported to LPR the construction contract was assigned to SRV when the project was near design completion the subcontracts were received through an open-bid process from a wide set of EU-based companies, In U.S. terms, the project was design-bid-build,