There was sufficient information on the original design drawings for Bit Solutions to prepare their quotation. This has not changed significantly since then.
Minor adjustment mays be required based on the final design which will be issued next week. We’ll ensure that the connections to the lifts are included in the design [if not already].
In terms of the Building B Server Room, I suspect that this may just be a typo and they are in fact referring to Building A. We’ll clarify this with them.
In terms of the Building B Server Room costs, these relate only to the hotel and hence are required; the team just needs to ensure that this is not also covered in the main server room package. The Building A Lobby has been documented as a separate package therefore the costs of this should be kept separate otherwise it will only get confusing.