Lakeside Energy from Waste Limited (Lakeside) was the developer of the Facility. Itochu Corporation
(Itochu) and Takuma Corporation (Takuma) were the engineering, procurement and construction
contractors for the Facility, together referred to as EPC Contractors. The manufacture of the economiser
blocks was subcontracted to Vulcan SA (Vulcan) by EPC Contractors.