26051 : problem is from dwell time on this product. The test cannot pass if it’s too fast, it is usually linked to long cables and small sections.
Dwell time test is not included in parameters on control report and it doesn’t impact test coverage.
The impact in on testing time only, you can adjust these parameters to make test pass as necessary.
We have to test again pieces to detect if insulation is not damaged by process punching flat cable).
If pieces tested 5 Mohms can pass all with parameter 20Mohms new dwell time (50% already tested again and can pass), I consider there is no critical risk on pieces tested with 10Mohms.
7262: 10Mohms are standards parameters approved since last MO and K. Sak is updating the form today.
5Mohms should be tested again since 10 Mohms can pass test properly.