ntres.
Fig. 7(b) show the optimal path between the 65 collection centres.
This optimal path has been calculated according to the optimization
formula shows in Eq. (9). Small size vehicles, visit each
waste collection centres through this optimal path and collects
waste from the collection centres. After that collected waste has
brought to the transfer station. Initially, all vehicles start from an
initial waste collection centre and each vehicle visit at least one
waste collection centre before going to transfer station. On the
other hand optimal waste transfer, we also consider that all waste
collection centres must be visited by at least one vehicle. The optimization
waste transfer path is represented by the sequence of the
collection centre. The sequence of the collection centres is follow