After the Seoul Olympics of 1988, international air traffic to Korea increased. In the 1990s, it became apparent that Gimpo International Airport could not cope with the increase in air traffic. To reduce the load on Gimpo International Airport, construction of the Incheon airport began in November 1992. It was constructed on reclaimed land between Yeongjong Island and Youngyu Island, and took eight years to construct, with an additional six months to test. The airport was officially opened in March 2001.
Initially, there were numerous problems, mostly involving baggage handling, which required the system to be operated semi-automatically. Most of the problems were fixed within a month, and the airport began to operate normally.
Air traffic increased markedly, and by early 2002 due to 2002 FIFA World Cup and 2002 Asian Games, it became apparent that the airport would be saturated by 2006. As a result, the construction of the second phase was initiated in February 2002. Originally, the construction was supposed to have ended by December 2008. Due to the Beijing Olympics in 2008, however, the construction schedule was modified to allow the construction to end by July 2008.
On 15 Novemb
After the Seoul Olympics of 1988, international air traffic to Korea increased. In the 1990s, it became apparent that Gimpo International Airport could not cope with the increase in air traffic. To reduce the load on Gimpo International Airport, construction of the Incheon airport began in November 1992. It was constructed on reclaimed land between Yeongjong Island and Youngyu Island, and took eight years to construct, with an additional six months to test. The airport was officially opened in March 2001.Initially, there were numerous problems, mostly involving baggage handling, which required the system to be operated semi-automatically. Most of the problems were fixed within a month, and the airport began to operate normally.Air traffic increased markedly, and by early 2002 due to 2002 FIFA World Cup and 2002 Asian Games, it became apparent that the airport would be saturated by 2006. As a result, the construction of the second phase was initiated in February 2002. Originally, the construction was supposed to have ended by December 2008. Due to the Beijing Olympics in 2008, however, the construction schedule was modified to allow the construction to end by July 2008.On 15 Novemb
การแปล กรุณารอสักครู่..
