• Crane operations shall check their cranes daily for oil, hydraulic oil, leaks, water etc and complete a Daily Equipment Checklist.
• Cranes having their configuration changed, Dismantled and re-erected will also be tested.
• The crane manufacturer manual will be adhered to for ongoing maintenance.
• No part of a crane which is subject to lifting stresses shall be altered, welded or changed in any way without reference to the crane manufacturer procedure and decertification.