Dear K. Angkool, Dear Factory Team,
Please see the results from our inspection the last 2 days below. Please also find the link to the pictures below.
Pictures Safety & 5 S April 2015
Points to improve:
Pump Assembly:
• Please remove personal belongings & personal tools from working area before audit
• Please sort your cabinets, sort out unnecessary things and structure and order content
Store:
• Please bring order in your goods to deliver area, e.g. orders from K. Triporn
• Please restructure QC area
Machining Team:
• Please clean up your area, also behind machines – all things not used anymore, please throw away
• Please sort our your cabinets & check your tools, many tools were missing
• All containers with any kind of liquid have to be stored on trays
Welding Area:
• Please clean up your area
• During audit time – no work on ways in factory!
• Please sort & clean raw material area – looks messy at the moment
Painting Area:
• Please always store all containers on a tray
• Please also check your liquid storage before audit – painting & thinner on trays please
• Please find solution for baseplate storage, secure the standing baseplates as they can fall and cause serious injuries
Overall:
• Please always check what kind of signage is necessary for which working station – if you sign a safety equipment on a working station it is 100 % necessary to wear it on this station!
• Please check all rails in factory, some not fixed yet and can fall
• Please also clean up the new office close to welding area, old food & many ants could be found
• Please clean up the locker in front of new office close to welding area – please see pictures
• Please check overall cleanness of factory – please remove all unnecessary/old/not in use items from factory
• Please move the tool storage from the wall at goods incoming
• Please always make sure all safety equipment is available for all staff
• Please install one are for charging the batteries – together with service, please consult with each other – mark the area around and install no smoking sign!
Outside:
• Please clean up outside area – old pumps, shelves, waste, etc.
• Please plan for motorbike parking outside – to bring more order and no wild parking of motorbikes anymore
• Please install area for dry the clothes, one place for all
Dear K. Angkool, Dear Factory Team,
Please see the results from our inspection the last 2 days below. Please also find the link to the pictures below.
Pictures Safety & 5 S April 2015
Points to improve:
Pump Assembly:
• Please remove personal belongings & personal tools from working area before audit
• Please sort your cabinets, sort out unnecessary things and structure and order content
Store:
• Please bring order in your goods to deliver area, e.g. orders from K. Triporn
• Please restructure QC area
Machining Team:
• Please clean up your area, also behind machines – all things not used anymore, please throw away
• Please sort our your cabinets & check your tools, many tools were missing
• All containers with any kind of liquid have to be stored on trays
Welding Area:
• Please clean up your area
• During audit time – no work on ways in factory!
• Please sort & clean raw material area – looks messy at the moment
Painting Area:
• Please always store all containers on a tray
• Please also check your liquid storage before audit – painting & thinner on trays please
• Please find solution for baseplate storage, secure the standing baseplates as they can fall and cause serious injuries
Overall:
• Please always check what kind of signage is necessary for which working station – if you sign a safety equipment on a working station it is 100 % necessary to wear it on this station!
• Please check all rails in factory, some not fixed yet and can fall
• Please also clean up the new office close to welding area, old food & many ants could be found
• Please clean up the locker in front of new office close to welding area – please see pictures
• Please check overall cleanness of factory – please remove all unnecessary/old/not in use items from factory
• Please move the tool storage from the wall at goods incoming
• Please always make sure all safety equipment is available for all staff
• Please install one are for charging the batteries – together with service, please consult with each other – mark the area around and install no smoking sign!
Outside:
• Please clean up outside area – old pumps, shelves, waste, etc.
• Please plan for motorbike parking outside – to bring more order and no wild parking of motorbikes anymore
• Please install area for dry the clothes, one place for all