Dear Ayu;
Please update all the payment for TM BRONZE WOOD and South Advance to 100% (percent) and items not install (meterial on site ) 85%
[percent] all the shipment already completed I hopes that you can clear the payment for me as soon as possible.
The items in Public building for 24 months detention the time is over some 48 month already. for the defect items wooden railing at 3rd.
floor (HRH Office) and wooden railing bridge connection to Malaysia historial hall you already deducted the payment to 0% and now the
wooden railing at pound (sitting pavillion) invoice No.99/88-50 total amount RM.160,000 if your boss consider to deducted the payment
to 0% I do not said anyting ,I only blame my self . the installation in out door wooden item to now already 48 months without mantainer.
I think this amount (wooden railing at pound) if deducted is easy for you said to your boss for you to update the payment. I can not wait
for long time because everyday my Bank chase me for loan payment and interest.
First time I thought after finish this project I have some money to clear my Bank loan and now after deducted so big amount from you.
the balance amount is not enought for me to clear my bank. I hope that your boss can understand and sympathize to me. I know that
is difficulty for you to decide too
At the conclusion I hopes that the end of this month you can settle the balance payment for the 2 sculptures at bowling area.
Thank for your kindness.
Best regard.
Kiang