Loss of air pressure without active consumers shall be less than 3.5 bars within 3 hours. The Contractor shall minimise these values as much as possible and verify the stated values on site after delivery of the first train unit.
Loss of air pressure without active consumers shall be less than 3.5 bars within 3 hours. The Contractor shall minimise these values as much as possible and verify the stated values on site after delivery of the first train unit.