Before disconnecting pressure-relieving devices, the connected piping and block valves should be checked to
ensure that they are sufficiently supported. After reinstalling pressure-relief valves, the related piping should be checked
to ensure that it is not imposing loads that would cause problems with the pressure-relief valve body such as distortion
leading to in-service leakage, a change in set pressure or binding of the internal components leading to a stuck valve.