2. Past Experience : In this method, the cost of the new product is approximately estimated through the use of past average actual costs of somewhat similar product. The cost is then adjusted to suit variations in the product, material and labour costs. In this method there is no coordination between the various sections of the plant and the estimating clerk lacks the manufacturing and technical background to arrive at an accurate cost estimate.