Comparing sun drying of one layer at an average temperature of 25 C
with artificial drying at the above named temperatures, it was found that sun drying took 2 to 3 days
to reduce the moisture content to Equilibrium Moisture Content (EMC), while this was achieved
within 150 min and 125 min with artificial drying at 55 C and 65 C respectively.