Parts
- Rubber boot for shore power plug
- Positive terminals
- Consumable & Vehicle Journey
Labour
- Check pump & take off to repair (Over current) and
wiring step down converter to USB connector on 15/08/2015 hrs
2.5 hrs
- Repair motor pump in work shop. Polish surface of rubber
imperer and testing 2 hrs on 29/08/2015
- Make DC connecting socket with owner 1.5 hrs on 25/09/2015
- Take off old shore power plug for install new
(But can't install because have to cutting wood first out) 1 hrs
on 26/09/2015
- Install shore power male & female with old cable & testting
on 29/09/2015 1.5 hrs
- Install new shore power cable from owner and take off old
positive terminals to make new 2 hrs on 27/10/2015
- Make new positive terminals one piece in work shop and bring
a positive terminals go to installed on boat 1.5 hrs on 28/10/15
- Take off old positive & negative bus bars from the electric panel
to make new at AEM Shop, clean up the contacts bus bars
positive & negative, make new positive & negative bus bars
2 hrs on 04/11/2015
- Installed positive & negative bus bars in the electric panel and
connect cable 3 hrs on 05/11/2015