The BN model presented in this study is static and it does not allow a real time monitoring of the equipment. Further, we do not treat the problem of multiple maintenance procedures and their sequences. However, in real conditions, some failures require a sequence of procedures to be resolved. It should be interesting to take into account these aspects in future work. Also the proposed approach will be applied and tested at other workshops in the world reputed SI.