According site need to do work but now we not have some drawing so could you please kindly check and send drawing to us?
1. Drawing of main steam piping line in 3D model. – Routing is done. But the same to be checked with stress calculation. So, we need about 2-3 weeks to issue the final drawings to site.
2. pipe rack of turbine building to boiler - we have to start with design of pipe rack structure. To be checked for calculation for loads & fabrication drawings to be made after this.
3. cooling pipe support ( as last time you hold K.Sittichai) How about this? – under progress. Expected to get drawings in next couple of weeks
4. GA of boiler feed pump. – Do you want GA of pumps only or Piping also? Please clarify.