Multi-barrier concept
Flexibility
Successful operating history
Utility experience
Cost
Sustainability and energy considerations
Design and selection of process trains
Start with three key pieces of information (1) the source water quality, (2) the desired finished-water quality, and (3) the quantity of water needed (the capacity of the facility).