To score: The workstation must start and finish the assembly of the part(s). Part installation can not involve 2 or more workstations. Example 1: Starter install is separated by Two Team Members. One Team Member obtains Starter and hand starts 2 bolts and torques the 2 bolts. The second Team Member down the line finishes the remaining 3 bolts the score would be 0 for this condition. Example 2. Starter install is separated by Two Team Members. One Team Member obtains Starter and hand starts 2 bolts and torques the 2 bolts using a DC Nut runner that is error proofed (the engine will not leave the workstation without the two bolts torqued to specification (error Prevent)). The second Team Member down the line finishes the remaining 3 bolts also using a DC Nut runner that is error proofed (the engine will not leave the workstation without the three bolts torqued to specification (error Prevent)). Because there is error proofing (must be error prevent not error detect) in place and there is no way a defect can leave the workstations full points are awarded (10 points)