Experimental results indicated that the failure occurred by interaction between the outer bottom surface of the pipe and surrounding environment leading to pitting and stress corrosion cracking in the
presence
of chloride ions.
This could have been aided by residual welding stresses and the characteristic low stacking fault energy of the material.