1. MOM with all parties
2. Cross sectional drawing of Chips unloading area considering 5m3 hopper and considering 45 degree angle and considering 2.2 m height for bag and to confirm if a pit is required or not . This area we need to decide if we need piling or not
3. Calculate length of pipe approximate for all conveying system
4. Please place all hopper V-113A/B , 114A/B, 115A/B , 116 A/B, 117A/B , 118A/B over 19.0 and connect piping minimum 45 degree or better to respective loss and feed hoppers inlet maintaining PE to PE inlet , PET MB to PET MB inlet . This was explained to Mr. Suphasit and loss and weight injection system
5. I am also sending old reference drawing of dryer from our existing plant , if we order to DHP with 5 hrs resident time it will be same , please see 3 pages for dryer and 2 pages for ADU for dryer. Hot chips conveying is not included as it was by gravity. You may make some draft copy to see elevation requirement .
Please note we have to complete engineering very urgently if we want to complete civil We would appreciate all thse supporting drawings are also needs to be completed with TBA .