No needs to place 2600P which we have enough in our inventory.
Just prepare PO for 6 of 4000D. I will explain the situation to Fuji,
and advise you if they can accept it.
For metal net tray, they also have metal net tray . I understand
we had the problem that the instrument didn't dry enough. After
Ruddy visited, and adjusted all machine, do you still have the same
problem ? It is very important that we should inform our customer
not to load too much instrument in the chamber. Fuji autoclave has
the vacuum system to circulate the air for the faster drying. If the
chamber is over loaded, this air circulation system does not work
well, and the result, the instrument is not dry enough.
The chamber is not filled over 80% of the capacity with the instrument.
Check with Watchara if the instrument is not dry enough with 80% load,
and advise me please.