Analysis of the harvest process, from the perspective of economics, logistics and technology, had revealed that at a 2 ha Dutch production facility four robots are needed to replace the skilled human work force during the peak season. Then assuming a success rate of 100%, a harvest cycle may take at most 10 s per cucumber fruit (Bontsema et al., 1999).