the order that I want the work done is , using your numbering . to describe what was actually agreed with Pong
2) price agreed but
i. replace and make [ as per specification ] better design 2 aft engine room hatches and increase the diameter of the drainage tubes to a minimum of 1 inch [ 2.54 cm ] internal diameter, so that hatches are water tight
ii. replace [ same specifications as hatches ] area of deck adjacent to S engine room hatches, that is soft from water entering the balsa core
iii. fit owner supplied hinges and locks
3) I do not understqnd
4) Agreed
1) several stages
i. build up deck so no pooling of water and after I [ or Mai ] have inspected and 2) & 4) completed, inspected and approved
ii. apply anti skid 2 types bigger particles aft of SS rails to be see and approved
I prefer smaller interim payment, to more closely march actual costs and will make very prompt payments when work approved by either Mai or myself
Regards
Henry D