Current car routes around the factory are both concrete surface and asphalt, as survey also revealed that the concrete has the work but the asphalt surface are degeneration do not use area total 2,950 m2 and the footpath around the factory, some area have settlement and rough uneven do not use area total 930 m2 The problems affecting the safety and security.