The technical documents for your plate heat exchanger and the assembly data are given in Appendix
Z. There you will find details about the weight of the apparatus, the dimensions for fixing it to the
ground, etc.
Please check whether the correct apparatus has been correctly tightened before installation. If this is
not the case, please contact our Customer Service Department (See Chapter 1.3 for address, phone
and fax number).
Of the apparatus has been delivered open or with the plate pack separate, you must proceed according
to Chapter V.3 or V.4.
The substrate of the place of installation must be checked to ensure that it has an adequate loadbearing
capacity, especially for the filled apparatus.
The frames are equipped with two fixing angles on the fixed frame plate and with one fixing angle or a
bottom fixture on the support. The apparatus can be fixed with foundation bolts and rawl plugs. When
installing on frames, platforms or upper storeys the customer must ensure that a safe ancho-ring is
provided. The dimensioned for the bottom fixture are given in the dimension sheet in Appendix Z.
When installing plate heat exchangers on a roof a lightening conductor is required. When installing it
outdoors a canopy or protective roofing must be provided. If this is not possible, the apparatus must
be covered with a protective plate.
Adequate space must be kept free all round the plate heat exchanger to allow a person to walk around
it. A distance of approx. 1.5 m is required between the plate heat exchanger and fixed pipes and sets
which are installed to enable assembly and service works to be carried out. In order to be able to open
the apparatus, there must be no installations between the movable frame plate and support.
The apparatus is integrated in the pipe network via connections for feeding and removing the media.
The counterpart to the connections on the apparatus must be attached to the pipes on site. Nozzles
on the plate heat exchanger, which are not connected must be closed tight on site using state of the
art means, e.g. as prescribed for refrigeration engineering in DIN 8975 and DIN EN 378. Please refer
to the technical documents in Appendix Z for the constructive design of the connections. Valves in the
intake and outlet pipes and suitable drain / purging devices in the immediate vicinity of the apparatus
are recommended for when service works are carried out on the plate heat exchanger.
For purge and / or oil drainage use the possibly existing connections, please. They are
significantly contributing to a failure-free operation of the plate heat exchanger.
When installing the pipes you must ensure that no forces and moments act on the plate heat exchanger
connections. If necessary, the inlet and outlet pipes must be propped with pipe holders.
If the connections are fitted with rubber linings, the average guideline values for the bolting torques for
the screw connection stay bolts / nuts given in Table 1 must be taken into consideration.
The technical documents for your plate heat exchanger and the assembly data are given in Appendix
Z. There you will find details about the weight of the apparatus, the dimensions for fixing it to the
ground, etc.
Please check whether the correct apparatus has been correctly tightened before installation. If this is
not the case, please contact our Customer Service Department (See Chapter 1.3 for address, phone
and fax number).
Of the apparatus has been delivered open or with the plate pack separate, you must proceed according
to Chapter V.3 or V.4.
The substrate of the place of installation must be checked to ensure that it has an adequate loadbearing
capacity, especially for the filled apparatus.
The frames are equipped with two fixing angles on the fixed frame plate and with one fixing angle or a
bottom fixture on the support. The apparatus can be fixed with foundation bolts and rawl plugs. When
installing on frames, platforms or upper storeys the customer must ensure that a safe ancho-ring is
provided. The dimensioned for the bottom fixture are given in the dimension sheet in Appendix Z.
When installing plate heat exchangers on a roof a lightening conductor is required. When installing it
outdoors a canopy or protective roofing must be provided. If this is not possible, the apparatus must
be covered with a protective plate.
Adequate space must be kept free all round the plate heat exchanger to allow a person to walk around
it. A distance of approx. 1.5 m is required between the plate heat exchanger and fixed pipes and sets
which are installed to enable assembly and service works to be carried out. In order to be able to open
the apparatus, there must be no installations between the movable frame plate and support.
The apparatus is integrated in the pipe network via connections for feeding and removing the media.
The counterpart to the connections on the apparatus must be attached to the pipes on site. Nozzles
on the plate heat exchanger, which are not connected must be closed tight on site using state of the
art means, e.g. as prescribed for refrigeration engineering in DIN 8975 and DIN EN 378. Please refer
to the technical documents in Appendix Z for the constructive design of the connections. Valves in the
intake and outlet pipes and suitable drain / purging devices in the immediate vicinity of the apparatus
are recommended for when service works are carried out on the plate heat exchanger.
For purge and / or oil drainage use the possibly existing connections, please. They are
significantly contributing to a failure-free operation of the plate heat exchanger.
When installing the pipes you must ensure that no forces and moments act on the plate heat exchanger
connections. If necessary, the inlet and outlet pipes must be propped with pipe holders.
If the connections are fitted with rubber linings, the average guideline values for the bolting torques for
the screw connection stay bolts / nuts given in Table 1 must be taken into consideration.