Thank you for your help eetl Udagawa Director Dear / Director Hanada hall / Shimura Deputy General Manager Dear
very.
We will contact you about the reality of this delay.
Capacity of molding's the 15,000 / week per side first, but due to the failure of the mold of low-cost products s / r, has been forced to production in one sided
last month.
By repair of the mold is complete, we are expected to be in production of
30,000 / week can be conducted with the production of two faces in this month.
However failure has occurred in the furnace mold was modified also, failed again to about 100 shots after the return, heat treatment delays are out.
The Company produces in two planes from
the 12th mold, which had been put out to repair separately, so went back to the 12th, but you can ship it It is expected to be in
the week after next.
Therefore, we expect shipment of
25,000 / week will enable the shipment after next after, but in coordination with contractors and purchasing To learn more,We will contact you in 20 days.