- Lee and Peña-Mora (2005) proposed using system dynamics to build dynamic project models to
assist planning and control of construction projects. This dynamic project model captures several
non-value adding change iterations (rework cycles and managerial change cycles). The simulation is
demonstrated using a case study in Road Bridge Construction, and many change option/policy
implications are summarized based on this case study.