Please note we already applied our best internal price for the mentioned items.
Unfortunately, the price of the components is subjected to variations with time. For this reason, it is not possible to extend the validity of my offer.
First quarter of 2017 for an order placed soon. Actual delivery can be checked only when the order is placed.
Item 30 would be packed in a wooden box 1500x1150x2070mm while item 40+60 would be in a 1400x1000x700mm wooden box.
I would also use protective vacuum sealed bags for sea transportation.
This is just to give you an idea. Actual dimensions and weights can be determined only at the moment of packing.
The installation of item 60 will take approx. 2-3 days in which the tubing line must be stopped (the sewing line can work normally). A mechanic would perform this task and I would be there too. After that, we can start with the installation of the JUKI. Training on the sewing machine and camera can be done in our plant and it should take 5 days here in Italy. Training itself would be for free but travel and accommodation of your personnel will be at your charge. After the installation of item 60, a skilled operator will join us in Cannew and he will perform the onsite testing of the machine. The duration of this phase will be determined after the training in our plant.
To summarize: one mechanic 2-3 days (leaves after item 60), one operator (to be fixed – arrives when item 60 is ready) and one engineer (stays for the complete duration of the installation).
I am expecting 0.50m long samples (already sewn) and enough thread in case we want to perform short tests on our machines. Type of material and thread depend on what you are planning to process on this machine. Samples will be used as a reference for quality checking and without them I cannot completely fix the other points in your list.