transformer inside the panel. 2) Install control panel in the dust collector machine All electrical wirings for panel, blower etcar to be completed at If there is some wiring to be disconnected for shipping, re-wiring procedure shall be submitted for site installation. 3) The panel shall have communication interface to line PLC for heavy and light failure (motor trips, etc. which includes the operation of the switch) to Line PLC.