1) Confirm the facility can operate as planned.(lead time and the tool change time)
2) Supplier plan the inspection and maintenance of facility and jigs and tools periodically? (Document for record tool life, PM plan, Daily check)
3) Standards spare parts number is set and order is done
4)Confirm the supplier have tooling setting standard.
5)Confirm the setting secure by clamp (loosen,unsteady)
6)Confirm actual process can smooth operate or not. (No have handwork for repair, M/C not alarm error.)