1. Wasin and Anhul – check customer feedback on dryness of rice bowl. Consider changing build to add sauce on top of chicken instead of mixing with the chicken
2. Wasin and Tanawan – check consistency of bite size
3. Op – have RE establish a process of quality control at cook station so supply base does not have to sort through pieces to find 9 that meet standard
4. Anhul – have team work with RE to move from talk lines to sound bites of key attributes.