PURCHASE REQUISITION
MANUFACTURING BY
BANGKOK INDUSTRIAL BOILERS CO.,LTD. JOB ORDER NO. B2 54122 DATE ISSUED :10/04/56 PAGE No.
PROJECT NAME : SRIWATTANA GREEN MODEL: DATE REQUIRED : 25/04/56 PR.NO. 894/44694
Item Raw Material Mat'l Spec. Q'ty Description Cost of Mat'l Receiver Operater Date
No Per Pc Disc.(%) Total Date By
INSTRUMENT AIR
1 PIPE GALVANIZE 40 Ø2" x SCH.40 x 6000 mm
2 PIPE GALVANIZE 30 Ø1" x SCH.40 x 6000 mm
3 PIPE GALVANIZE 30 Ø1/2" x SCH.40 x 6000 mm
4 ELBOW 90˚ LR GALVANIZE 30 Ø1/2" x SCH.40 x BW
5 ELBOW 90˚ LR GALVANIZE 30 Ø1" x SCH.40 x BW
6 ELBOW 90˚ LR GALVANIZE 30 Ø1/2" x SCH.40 x BW
7 CON.REDUCER GALVANIZE 30 Ø1" x Ø1/2" SCH.40 x BW
8 TEE REDUCER GALVANIZE 30 Ø2" x Ø1" SCH.40 x BW