With an expected average lifetime of 30 years of new offshore wind power a total capacity of 15 GW can be reached by installing 500 MW/yr. Subsequently, the 15 GW can be maintained by a continuous replacement of 500 MW each year. Since 3 GW has already been installed, the total capacity can be reached within approximately 25 years, i.e. in year 2030.