Testing
Prior to the Supplier commencing roll out the cell site, the Supplier will prepare a comprehensive Test Strategy and Plan, in consultation with DTAC and/or its designate, which test plan will be agreed to by DTAC. The Test Strategy and Plan will detail the proposed test strategies, and Acceptance Testing criteria for both Internal and Industry tests (Standard code and Dtac’s requirement that are defined in Annex 01 – Technical Specification Requirement and relevant appendix/attachment under the annex 01). The Test Strategy and Plan will lay down the benchmark criteria against which the Solution will be tested and accepted by DTAC.
The Supplier shall describe their proposed test plan and the timeframe within which it will be accomplished.