A major part of the three-runway system project is the Environmental Impact Assessment (EIA), which includes a series of studies assessing the potential environmental impact of the project across 12 key aspects. The studies were undertaken by a strong EIA Study Team, comprising an experienced lead EIA consultant, a review consultant and a number of reputable experts, both local and overseas.
The AA is committed to tackle the potential environmental impacts arising from the 3RS project and proposed more than 250 measures to avoid, minimise, mitigate and/or compensate for them in the EIA report. With extensive mitigation measures, the report concluded that all the potential impacts of the 3RS project could be reduced to an acceptable level.
On 7 November 2014, the 3RS project reached an important milestone with the approval of the EIA report and granting of Environmental Permit by the Director of Environmental Protection. The AA is committed to carrying out all the mitigation measures proposed in the EIA report, and fully complying with all the conditions listed by the Environmental Protection Department in a highly prudent, transparent and professional manner, with the aim of achieving a balance between economic development and environmental conservation.
A major part of the three-runway system project is the Environmental Impact Assessment (EIA), which includes a series of studies assessing the potential environmental impact of the project across 12 key aspects. The studies were undertaken by a strong EIA Study Team, comprising an experienced lead EIA consultant, a review consultant and a number of reputable experts, both local and overseas.The AA is committed to tackle the potential environmental impacts arising from the 3RS project and proposed more than 250 measures to avoid, minimise, mitigate and/or compensate for them in the EIA report. With extensive mitigation measures, the report concluded that all the potential impacts of the 3RS project could be reduced to an acceptable level.On 7 November 2014, the 3RS project reached an important milestone with the approval of the EIA report and granting of Environmental Permit by the Director of Environmental Protection. The AA is committed to carrying out all the mitigation measures proposed in the EIA report, and fully complying with all the conditions listed by the Environmental Protection Department in a highly prudent, transparent and professional manner, with the aim of achieving a balance between economic development and environmental conservation.
การแปล กรุณารอสักครู่..