When the product reaches the maturity phase, i.e., when demand stabilizes over time, then the outsourcing decision should be re-considered under the framework discussed in Section 9.3. For instance, if earlier an integral product was outsourced due to capacity constraints, then the firm should consider installing additional capacity to meet the stabilized demand, and manufacturing the product in-house.