The technique which has been used in this study is the
work study technique in the first bottle neck operations to
identify the causes reducing the production rate by stopping
the assembly line and then further on to these stations the
root cause of the problems are identified by method study
technique and then after the new improved method was
developed and implemented for trial period of 10 days and
trial period time study of these stations were conducted and
the results of the time study were compared before and
after implementation of the new method.